Больше информации по резюме будет доступно после регистрации
ЗарегистрироватьсяWas online yesterday at 21:59
Candidate
Male, 40 years, born on 25 December 1984
Considers offers
Ust-Kamenogorsk, willing to relocate (Other regions, Russia), prepared for business trips
Projects manager
Specializations:
- Head of production
Employment: full time
Work schedule: full day, rotation based work
Work experience 14 years 6 months
October 2013 — currently
11 years 6 months
ECM Technologies
Ust-Kamenogorsk, www.ecm-furnaces.com/
Industrial Equipment, Machine Tools and Components... Show more
Project Manager
2013-2015 Project in Kazakhstan. Ust-Kamenogorsk, client: JSC *Kazakhstan Solar Silicon*
Field of activity: Green Energy
Responsibilities:
Control and planning of production process of wafers fabrication from multicristallic silicon for photovoltaic panels, maintenance organization on production line, training of staff, quality management, crisis management, time management.
Results:
Successful pre-shipment tests of the production line, successful preliminary tests of the production line, successful final tests of the production line including the wafers manufacturing technology transfer to the end user.
2015-2018 Project in Russia. Dimitrovgrad, client: JSC "SOSNY"
Field of activity: Nuclear Energy
Responsibilities: Control and planning of following project steps:
1. Preliminary design
2. Final design
3. Manufacturing
4. Mounting and funtional tests
5. Preliminary acceptance test
6. Shipment and installation of equipment on site of the client
7. Final acceptance test
Results:
Realisation of the project in time within the planned budjet. Acomplishment of all requirements of the customer technical specification.
2018-2020 Project in Latvia. Rezekne, client: LEAX GROUP
Field of activity: Heat treatment of transmission parts for Volvo company.
Responsibilities:
- Proper execution of the project by managing project from signing of the contract and technical specification until final acceptance of the equipment.
- Control on the timeline of the project and realisation of works as per dedicated budgets.
- Checking and approvement of the design documentation of the equipment with customer.
- Responsibility for the quality of the delivered equipment.
- Management of the equipment installation on customer premise.
- Troubleshooting and monitoring of installation works on customer premise.
Results: Realisation of all requirements as per technical specification of the customer whith respect of the allocated budget.
2019-2021 Project in Russia. Perm, client: Reductor-PM
Field of activity: Furnace for carburizing of parts for aeronautic industry
Responsabilities:
- Ensuring proper execution of the project in accordance with the terms of the contract and the client's technical specifications.
- Carrying out work in compliance with budget, deadlines and quality.
- Monitoring of works on the project.
- Development, coordination and control of schedules at all stages of the project.
- Managing of the equipment installation team, organization of safety rules instruction of the team which are in force on customer site.
- Realisation of final acceptance tests of the equipment on customer site.
- Organisation of troubleshooting works on submerged problems during installation and commisionning works.
Results: Timely manufactured, tested and delivered equipment on site of the client. Succesful final acceptance test.
2020-2022 Project in India. Dehli, client: SONA BLW Precision
Field of activity: Heat treatment of transmission parts for Tesla company.
Responsibilities:
- Proper execution of the project by managing project from the signing of the contract and technical specification until final acceptance while respecting budgets, deadlines, and quality.
- Checking and approvement of the design documentation of the equipment.
- Responsibility for the quality of the delivered product.
- Management of the equipment installation and comissioning on site of the client.
Results: Delivery of the equipment in time, succesfull commisionning of the equipment.
2023-2024 Project in India. Chennai, client: IM GEARS Pvt. Ltd
Field of activity: Production, supply, installation and start up of heat treatment lines of transmission parts for Stellantis company.
Main Responsibilities:
- Control and management of technical and economic aspects of the project.
- Management and control over the progress of the project, schedules and budget compliance.
- Compliance with Kaizen and 5S production standards.
Functional Responsibilities:
Equipment design:
- Control over the development of equipment in accordance with the specifications and technical requirements of the client, as well as in accordance with the standards of the country of product destination.
- Definition of goals and necessary resources (human, technical, financial) for the proper implementation of the project and their monitoring throughout the entire project implementation period.
- Identification and analysis of potential risks that may arise during the project implementation, development of action plans aimed at their elimination.
- Control over the correctness of the functional analysis, FMEA and risk analysis in the project.
Work with contractors for the supply of components and assemblies:
- Participation in the selection of outsourcing or internal production of components of the final product.
- Control over the execution of purchases in accordance with the technical specifications of the project and delivery dates.
- Control over the development of specifications for the supply of components in accordance with the contractual documentation of the project.
- Participation in negotiations with suppliers of components in order to achieve the optimal cost of purchased components, ensure the proper quality of manufactured materials or assemblies, participate in audits of suppliers.
Manufacturing process:
- Coordination factory assembly workshop teams, provide them with all the information necessary for the proper execution of the operations incumbent on them, both technical and functional.
- Interface organisation between the Design Offices and the workshops, particularly in the context of managing technical modifications.
Manufacturing process:
- Coordination of the equipment assembly process in the enterprise workshops within the framework of the project.
Installation of equipment at the customer's site:
- Organization of installation works at the customer's site.
- Monitoring and solving problems arising at the site during the installation of equipment.
- Carrying out final acceptance of equipment at the customer's site.
- Commissioning of the supplied production line.
August 2012 — September 2013
1 year 2 months
CEIS
Ust-Kamenogorsk, www.ceis.eu/
Business Services... Show more
Projects manager
Responsibilities:
Checking of good implementation of construction drawings on the construction area, communication with the client, participating in the creation of the construction schedules and schedules for installation and connection of the equipment in the factory, technical control of the mounting, installation and connection of the equipment, control of the clean room building, participation in edition of Technological Reglement of the factory.
Results:
Realisation of construction works in the strict accordance with building drawings, timely installation and start up of the equipment in the factory.
March 2012 — July 2012
5 months
LLP «Power Beton»
Karaganda
Chief of the laboratory
Responsibilities:
Realisation of tests and implementation in production of the new technology of cement production type M400, M500 based on blast furnace slag and superplasticizers. Optimization of beton composition for slag blocs production on Namtas line. Optimization of heavy beton composition for reinforced beton slabs production, participation in development of asphalt production technologies.
Results:
Achievement of positif results of tests and definition of most optimal composition of cement type M400 and M500, approuvement and implementation in production of optimized compositions of concrete for slag bricks production on Namtas line, definition of most optimal and economically profitables compositions of heavy beton for reinforced beton slabs production.
March 2011 — September 2011
7 months
Ecocup DISTRIBUTION
France, www.ecocup.fr
Hotels, Restaurants, Food Service Industry, Catering... Show more
Trainee, acting Manager for Transport Logistics
Responsibilities:
Ensuring of the efficient work of the warehouse, delivering just in time of goods to clients, organization of loading and unloading operations, management of the personnel.
Manager of the project: Implementation of 5S and ABC method in the warehouse.
Results:
Economy of 25% in transport expenditures.
October 2010 — February 2011
5 months
ArcelorMittal Dudelange S.A.
Luxembourg, www.arcelormittal.com
Metallurgy, Metalwork... Show more
Participant of project in "Reequipment of the warehouse of final products"
Responsibilities:
Calculations for optimization of the warehouse area, statistical analysis of production, the implementation of the Kanban system in production.
Results:
The management approval of the proposed action plan for optimizing of the warehouse area.
March 2010 — July 2010
5 months
ArcelorMittal Stainless Précision Europe
Metallurgy, Metalwork... Show more
Trainee
Responsibilities:
Analysis of the transport logistics functioning of the enterprise, the introduction of new indicators to monitor the efficiency of the transport department, the calculation of profitability.
Results:
Reduction of transportation costs by 18%.
Skills
Skill proficiency levels
About me
Project management, preference for collective and team work. Effective and rational distribution of tasks, strict following to one's own duties, responsibility. Ability to learn and adapt to new conditions. Ability to work at a high tempo, communication skills and diligence.
Knowledge and practical experience of 5S, Kanban, Six Sigma, TPM, KAIZEN, ABC method implementation in production. Monitoring and improving of the product quality. Ability to perform a qualitative analysis of production activities, find problem areas and offer effective solutions.
Higher education (master)
2011
Ecole des Mines de Nancy (France)
Materials and Production Management, Engineer
2008
Karagandy State Technical University
Production of construction materials, articles and structures, Master
2006
Karagandy State Technical University
Organization and management of transport, Engineer
Languages
Professional development, courses
2009
Learning languages
CAVILAM, French and english languages
Citizenship, travel time to work
Citizenship: Kazakhstan
Permission to work: Kazakhstan, Russia
Desired travel time to work: Doesn't matter